Natural Gas

Poland celebrates 400th delivery of liquefied natural gas

The delivery was the 71st received at Swinoujscie this year – already well beyond the previous annual record of 62 deliveries received in 2023.

Poland celebrates 400th delivery of liquefied natural gas

SEATTLE (Oil Monster): On Sunday, the Aktoras, a 299-metre-long tanker, unloaded a shipment of liquefied natural gas (LNG) at Poland’s regasification terminal in Swinoujscie – the 400th such delivery that the facility on the Baltic coast has received since opening almost exactly a decade ago.

The landmark emphasised how integral the terminal has become to Poland’s energy strategy, in particular the shift away from Russian supplies, which began well before the 2022 invasion of Ukraine but accelerated afterwards.

A record number of LNG deliveries have arrived at Swinoujscie this year, accounting for around 40% of Poland’s gas demand. The country also aims to open one, and possibly two, more terminals in the coming years, as it seeks to become a regional hub, supplying gas to Ukraine, the Czech Republic and Slovakia.

 The Aktoras unloaded a cargo of 160,000 cubic metres of LNG from the United States. After regasification (i.e. being converted from liquid to gas), it will amount to 96 million cubic metres of natural gas.

The delivery was the 71st received at Swinoujscie this year – already well beyond the previous annual record of 62 deliveries received in 2023. The 2025 figure is likely to rise to 82 by the end of this year, says Gaz-System, Poland’s state gas transmission operator.

That has helped make “the Swinoujscie terminal one of the pillars of building Polish energy sovereignty” since it opened in December 2015, declared Wojciech Wrochna, the government’s plenipotentiary for strategic energy infrastructure, on Sunday.

Earlier this month, Poland’s energy ministry confirmed that it is in talks with the US – which is currently the country’s main LNG supplier – over acting as a regional hub for gas deliveries to Ukraine and Slovakia.

Shortly afterwards, Polish state energy giant Orlen signed an agreement with its Ukrainian counterpart, Naftogaz, to continue supplying Ukraine with American gas delivered via the Baltic as LNG. Orlen began doing so earlier this year.

To meet anticipated demand, construction recently began on a second terminal, to be located in Gdansk, that will open in 2028 with an annual capacity of 6.1 billion cubic meters (bcm). That will boost the 8.3 bcm capacity of Swinoujscie.

Last month, Gaz-System announced that it had begun gauging market interest from neighbouring countries in LNG imports, with the aim of assessing whether to build a second floating terminal in Gdansk alongside the one already under construction.

In 2022, Poland also opened the Baltic Pipe, which brings gas from Norway to Poland across the Baltic Sea. Last year, it supplied around 6.75 bcm of gas, compared to 6.1 bcm that arrived as LNG in Swinoujscie.

Courtesy: www.notesfrompoland.com

OilMonster Premium

Track the prices behind the story

Daily prices for 281 crude grades, Brent–Dubai spreads, history back to 2009 and Excel downloads.

Keep reading

Related news

More energy news