Natural Gas

Tellurian Receives U.S. Approval for Driftwood Gas Pipelines

The U.S. Federal Energy Regulatory Commission approved the Louisiana-based pipelines on April 21.

Tellurian Receives U.S. Approval for Driftwood Gas Pipelines

SEATTLE (Oil Monster): Liquefied natural gas (LNG) developer Tellurian Inc said on Monday the U.S. energy regulator had authorized Line 200 and Line 300 of its $1.4 billion Driftwood natural gas transmission pipeline project.

The U.S. Federal Energy Regulatory Commission approved the Louisiana-based pipelines on April 21. The company expects the project to be operational in 2023 to meet the growing demand for natural gas in Southwest Louisiana.

The pipelines will have a capacity to supply up to five and a half billion cubic feet of natural gas daily, the company said in a statement.

Meanwhile, Tellurian is yet to take a final investment decision on its Driftwood LNG export terminal, which has witnessed several setbacks with companies such as Shell Plc exiting the $13.6 billion project last year.

Courtesy: www.naturalgasworld.com

OilMonster Premium

Track the prices behind the story

Daily prices for 281 crude grades, Brent–Dubai spreads, history back to 2009 and Excel downloads.

Keep reading

Related news

More energy news