SEATTLE (Oil Monster): The Interconnector UK pipeline transporting gas between Britain and Belgium proposed on Wednesday a shutdown for maintenance between April 2 and April 12, 2019.
Flows will be reduced to zero during the 10-day period, operator Interconnector UK Limited said in a statement.
The pipeline transports gas both ways, usually switching to exporting gas to the Continent during the summer months. A final announcement confirming the date of the shutdown is due on Aug 13.
Courtesy: www.indiatimes.com
Forozan Blend | 75.61 | |
Iran Heavy | 75.71 | |
Iran Light | 77.66 | |
Forozan Blend | 84.68 | |
Iran Heavy | 84.48 |