SEATTLE (Oil Monster): Interconnector (UK) Limited said on Monday it would shut down its gas pipeline from Britain to Belgium for planned maintenance as of April 21, 2019 for 10 days.
The pipeline, running from the Bacton terminal on the English east coast to Zeebrugge in Belgium, has a capacity of between 630 and 803 gigawatt-hours per day, depending on the direction of travel.
Courtesy: www.economictimes.com
Forozan Blend | 75.61 | |
Iran Heavy | 75.71 | |
Iran Light | 77.66 | |
Forozan Blend | 83.52 | |
Iran Heavy | 83.32 |