Energean Israel Signed Transmission Deal with INGL to Boost Gas Exports
The project has already received $70m unsecured ten-year term loan from Bank Hapoalim in Israel.
SEATTLE (Oil Monster): Energean Israel has entered into a transportation agreement with Israel Natural Gas Lines (INGL) to deliver up to 1 billion cubic meters (bcm) of natural gas annually through the upcoming Nitzana pipeline, which will connect Ramat Hovav to the Egyptian border in the Nitzana area.
The contract spans 15 years and includes provisions for both early termination and possible extensions. During the construction phase of the Nitzana line, Energean will temporarily use capacity on the Jordan-North pipeline to ensure continued gas transmission.
The Nitzana pipeline’s completion timeline is contingent on finalized transport agreements with Energean, Leviathan, and Tamar. Once all contracts are signed, construction is projected to take roughly three years. Energean Israel will finance about 16.4% of the project’s development costs, including work on the compression station.
To support the initiative, Bank Hapoalim has provided an unsecured $70 million loan with a 10-year term, disbursed in stages—starting with a 40% upfront payment, followed by installments tied to project milestones.
In addition, Energean has signed a non-binding term sheet with a client in the Eastern Mediterranean for the potential sale of its natural gas output.
YOU MAY ALSO BE INTERESTED IN:
Energean Signed a New Gas Sale and Purchase Agreement with Kesem Energy Ltd.
Track the prices behind the story
Daily prices for 300+ crude grades, Brent–Dubai spreads, history back to 2009 and Excel downloads.



