oilmonster
Loading prices...

Register/Sign in
oilmonster
Natural Gas September 10, 2025 01:40:10 AM

Growing Natural Gas Deficit Leads Egypt to Ramp Up Natural Gas Imports

Anil
Mathews
OilMonster Author
This year, Egypt is seeking to address any shortfall in natural gas supply by ramping up import purchases of liquefied natural gas (LNG).
Growing Natural Gas Deficit Leads Egypt to Ramp Up Natural Gas Imports

SEATTLE (Oil Monster):  In August 2025, Egyptian firm Blue Ocean Energy struck a $35 billion deal with partners in the Chevron-operated Leviathan field offshore of Israel to import more natural gas from Israel, the latest move by Egypt to meet natural gas demand that is outpacing domestic production. In our latest update to the Eastern Mediterranean Energy briefing, we discuss the drivers behind Egypt’s dwindling natural gas supply and analyze the natural gas dynamics in the region.

We estimate a country’s implied natural gas balance by subtracting domestic natural gas consumption from domestic production. A positive number indicates a surplus, while a negative number indicates a shortfall in supply.

The discovery and fast-track development of the Zohr field, Egypt’s largest offshore natural gas discovery to date, brought a significant boost to production and initially indicated that Egypt could become a regional exporter of natural gas. The field was discovered in 2015 and developed in 2017. However, operational and technical issues at the Zohr field resulted in lower production, requiring Egypt to turn to natural gas imports to meet domestic demand for natural gas, which has steadily increased over the past decade.

This year, Egypt is seeking to address any shortfall in natural gas supply by ramping up import purchases of liquefied natural gas (LNG). It is also chartering three additional floating storage regasification units (FSRUs) that are scheduled to begin operations in Ain Sukhna on the Gulf of Suez and in Damietta on the Mediterranean Sea by the end of third-quarter 2025. A fourth FSRU, the Höegh Gandria, is scheduled to replace the Höegh Galleon, which has been operating at the Port of Sumed near Ain Sukhna, in fourth-quarter 2026.

Courtesy: www.eia.gov


×

Quick Search

Advanced Search