50.24$US/1 Barrel
65.52$US/1 Barrel
60.92$US/1 Barrel
75.91$US/1 Barrel
75.61$US/1 Barrel
75.71$US/1 Barrel
77.66$US/1 Barrel
70.15$US/1 Barrel
72.00$US/1 Barrel
74.25$US/1 Barrel
55.80$US/1 Barrel
62.00$US/1 Barrel
55.28$US/1 Barrel
67.00$US/1 Barrel
64.72$US/1 Barrel
60.50$US/1 Barrel
62.00$US/1 Barrel
59.25$US/1 Barrel
64.25$US/1 Barrel
65.75$US/1 Barrel
485.00$US/MT
378.00$US/MT
705.00$US/MT
585.00$US/MT
508.00$US/MT
518.50$US/MT
368.00$US/MT
395.25$US/MT
678.00$US/MT
880.50$US/MT
SEATTLE (Oil Monster): In the second half of February, the Czech Minister of Industry and Trade, Jozef Síkela and the Czech Prime Minister, Petr Fiala visited Poland. The intergovernmental meetings included discussions on two natural gas projects: the construction of an interconnector gas pipeline (“Stork II”) between the two countries, and possible Czech investment in a planned LNG import terminal in Gdansk. Both ideas appear likely to come to fruition, as Warsaw and Prague ultimately share the same perception of gas security issues after Putin’s reinvasion of Ukraine.
The concept behind the Stork II project is nothing new, as the primary Polish and Czech gas transmission operators began studying such a pipeline interconnector back in 2015. The plan initially called for commissioning Stork II in 2018; the reason why this schedule was not followed ultimately boiled down to differing perceptions regarding gas supply security and the Nord Stream 2 pipeline. Czechia was to become a transit country for Russian gas via Nord Stream 2 as a part of the “Capacity4Gas” project, whereas Warsaw feared that Nord Stream 2 would open yet another door through which Moscow could enter the Polish market. Now that Nord Stream 2 is effectively dead and Prague has revised its stance on Russian gas imports, the two countries are once again looking at Stork II. The project was officially endorsed by Polish and Czech officials back in September 2022, with both parties turning to the European Commission for financial support for the proposed pipeline.
Polish interest in Stork II is part of the country’s strategy of expanding pipelines with its neighbors; back in 2022 Gaz-System commissioned interconnectors with Lithuania and Slovakia. Prague’s goal, on the other hand, is to secure additional sources of natural gas, now that Russia is out of the national market. CEZ Group, the Czech national utility company, has already gained access to three billion cubic meters per year of regasification capacity from the new Dutch LNG terminal in Eemshaven. Furthermore, Czechia is becoming reliant on gas supplies from Norway to fulfill its energy needs. As part of future diversification efforts, Czechia is currently lobbying for the right to invest in a future floating LNG terminal in Gdansk, Poland, which is scheduled to be completed in 2028. According to the latest information, Prague would like a portion of Gdansk’s LNG capacity in exchange for equity investment.
While there is no question that Putin’s war of aggression against Ukraine created a new impetus for Polish-Czech gas cooperation, it should be understood the energy partnership between the two countries has a solid foundation beyond this. Both countries are expecting significant growth in the demand for natural gas domestically, as their energy sectors transition away from coal. This makes the construction of Gdansk’s new LNG terminal all but necessary.
Polish officials should welcome possible Czech financing of the project, as it could enable the deployment of a second floating storage regasification unit (FSRU), thereby doubling the capacity of the terminal from 6 to 12 billion cubic meters per year—something Warsaw has already expressed interest in.
If successful, gas cooperation between Poland and Czechia will positively contribute to the energy security of Central Eastern Europe, of course, but it could create additional opportunities for Ukraine too. Kiev has long been interested in access to the LNG terminals in the region. Even if Ukraine’s national oil and gas company, Naftogaz, aims at a domestic gas production increase, the war still might have a devastating effect on the country’s upstream capabilities. It should, then, be taken into account that Ukraine need to import LNG even after Russian aggression is beaten back, and the Gdansk FSRU project would be a perfect fit if a new Polish-Ukrainian gas interconnector was constructed. In such a case, a new import terminal in Poland may serve as a gate for LNG supplies (including the ones from the United States) to the whole of the region.
Courtesy:www.jamestown.org
Forozan Blend | 75.61 | |
Iran Heavy | 75.71 | |
Iran Light | 77.66 | |
Forozan Blend | 70.15 | |
Iran Heavy | 72.00 |